- Supply of protection relays any make suits to your budget and system requirement.
- Study the existing system and suggest the relevant relays with necessary ANSI applications.
- Dismantle the old relays without any system disturbance with minimum power outage.
- Install the relays online / minimum power shutdown if critical.
- Revised relay setting calculation using latest power system software.
- Suggest the relay configuration I/O logics.
- Configure the relay according to your scheme requirement.
- Test and commission the relay without / optimum power shutdown.
- Support after commissioning also whenever you face a problem.
The system feasibility study then suggest and implement the following schemes…
-
- Islanding scheme.
- Load shedding scheme.
- Auto synchronizing schemes DG with grid.
- Auto change over schemes in 2 incomer and bus coupler panels